Welding is the most measurable trade there is, and welders’ resumes are among the least measured.

Every weld you have made is either accepted or rejected against a standard. Your qualifications name the code, the process, the position, the material and the thickness range. A shop can look at two numbers — your reject rate on inspection and your qualification list — and know more about you than a page of adjectives could ever say.

The ten examples below cover where welders actually get hired: entry-level through inspector, structural, pipe, fabrication, TIG, pipeline, aluminium and marine, and robotic. Each is built around figures a welding supervisor would recognize immediately.

Welder Resume Examples by Process and Industry

Find the one closest to your work — a process, an industry, or a stage. The figures are illustrative; swap in your own and keep the shape.

The Qualification Block Is the Resume

No other trade has a credential this precise. A welding qualification names the code, the process, the position, the base material, the thickness or diameter range, and the date — and a supervisor reads it as a complete description of what you are allowed to weld.

Most welder resumes compress all of that into “certified in MIG, TIG and stick”, which throws away every useful piece of information and makes a supervisor ask for the actual papers anyway.

Qualification block

WELDING QUALIFICATIONS
[AWS D1.1] — [SMAW], [3G and 4G], [A36/A572], [1/8 to 1 in], qualified [Month Year], continuity current
[ASME Section IX] — [GTAW root / SMAW fill], [6G], [carbon and 304L], [2 to 8 in], [Sch 10–80], [Month Year]
[API 1104] — [SMAW downhill], [6G], [X42–X65], qualified [Month Year]
Processes: [SMAW, GTAW, GMAW, FCAW, SAW]
Inspection history: [about 600] welds inspected by [UT and RT] last year, [1.1%] reject rate

Anatomy of a Welder Resume

Three further parts complete the document.

The header

Short. The qualifications block directly beneath it does the heavy lifting.

Header

MARCUS D. [SURNAME]
Structural and Pipe Welder — [AWS D1.1] and [ASME IX] qualified, [6G]
[City, State] · ([000]) 555-0000 · [name]@email.com
OSHA 30 · Confined Space · Fall Protection · [Rig truck and welder] · willing to travel [100%] / [per diem work]

The summary, with the reject rate

Three lines, and the reject rate in one of them. It is the comparison figure in this trade.

Summary

[AWS D1.1] and [ASME IX] qualified welder with [nine] years across structural steel and process piping. Last year [about 600] welds were inspected by [UT and RT] with a [1.1%] reject rate against a shop average of [2.8%]. Comfortable [6G] on [carbon and 304L] from [2 to 8 in], and run [GTAW] root with [SMAW] or [FCAW] fill. Hold continuity on every qualification listed.

The bullet formula

Process, material, position, volume, result. All five, every time.

Bullets

• Welded [about 1,400] joints in [304L and 316L] stainless from [2 to 6 in] using [GTAW] root and [SMAW] fill, with [RT] reject rate at [0.9%]
• Completed structural welding on [340 tons] of [A572] steel for a [six]-storey frame, passing [UT] on [97.6%] of inspected welds first time
• Reduced weld rework in a [14]-welder shop by about [30%] by introducing a fit-up check before tack rather than after
• Welded [about 5,800 ft] of [X52] pipeline in [12 in] under [API 1104] with a repair rate of [2.3%]

Copy-Ready Summaries and Bullets by Lane

Four blocks you can adapt directly.

Entry-level summary

With no production history, the test plates are the argument.

Entry-level

Welding school graduate with [900] arc hours and [four] test plates passed: [AWS D1.1 SMAW 3G and 4G] on [A36], and [GMAW 2F and 3F]. Can run [SMAW, GMAW and FCAW]; [GTAW] on carbon and thin stainless at a practiced but not production standard. [Eight] months on a production floor doing [tack and fit-up] with about [1,100] parts tacked. Looking for a seat where I can test into [6G] within the first year.

Pipe welding bullets

Diameters, schedules, materials, positions, and the RT record.

Pipe

• Welded about [1,400] joints a year in [carbon, 304L and 316L] from [2 to 8 in], [Sch 10 through 80]
• Held an [RT] reject rate of [0.9%] across approximately [900] radiographed joints last year
• Ran [GTAW] root with [100% argon] purge on stainless, with internal bead condition verified by [borescope] on [critical service] lines
• Completed [two] plant turnarounds of [14] and [21] days welding [12–16] hours a day with no rejected welds in the second

Structural bullets

Tonnage, positions, inspection method and result.

Structural

• Welded [340 tons] of [A572 Grade 50] on a [six]-storey moment frame, qualified [3G and 4G], with [UT] acceptance at [97.6%] first time
• Completed [complete joint penetration] welds on [142] moment connections to [AWS D1.8] seismic requirements
• Welded [about 900] linear ft of [fillet] welds on [built-up plate girders] with [MT] acceptance at [99.1%]
• Trained [three] welders through their [D1.1 3G] qualification, with all [three] passing on the first attempt

Inspection-track summary

Hands-on credibility first, then the certification, then what is genuinely new.

Toward inspection

[CWI] certified in [Month Year] after [eleven] years welding structural and pipe. Hold [AWS D1.1] and [ASME IX] qualifications and have welded about [12,000] inspected joints, which is why I can tell a cosmetic concern from a rejectable one. Over the last [eighteen] months I have performed about [2,400] visual inspections and written [140] NCRs. The part that is still new to me is [procedure qualification and WPS review], which I am working through under a senior inspector.

Processes, Codes and Keywords Supervisors Search For

  • Processes: SMAW, GTAW, GMAW, FCAW, SAW — written out and abbreviated, since job postings use both.
  • Codes: AWS D1.1, D1.2, D1.5, D1.6, D1.8, ASME Section IX, ASME B31.1 and B31.3, API 1104, API 650, ISO 9606.
  • Positions: 1G through 6G, plus F positions for fillet work. Name the ones you are current in.
  • Materials: carbon steel grades, 304L and 316L stainless, duplex, Inconel, aluminium alloys, chrome-moly.
  • Inspection: VT, MT, PT, UT, RT, PAUT — and your result against each you have been inspected by.
  • Industry: structural, process piping, pipeline, pressure vessel, shipbuilding, nuclear, pharmaceutical and sanitary.

Write out the full process names alongside the abbreviations. A keyword screen may be set for “TIG” or for “GTAW” and a resume carrying only one of them is invisible to half the postings.

What Counts as Proof

Strong

AWS D1.1 qualified SMAW 3G and 4G on A36 and A572, 1/8 to 1 in, current. ASME IX, GTAW root with SMAW fill, 6G, carbon and 304L, 2 to 8 in. About 600 welds inspected by UT and RT last year with a 1.1% reject rate against a shop average of 2.8%.

Weak

Certified welder proficient in MIG, TIG and stick welding with experience across structural and pipe applications and a strong commitment to quality and safety.

The second says nothing a supervisor can act on. The first answers every question they would otherwise ask at interview.

Give the Reject Rate, Even If It Is Not Zero

This is the most useful number on a welder’s resume and the one most often left out, usually on the theory that any rejects look bad.

They do not. A supervisor knows their own shop’s rate and knows it is not zero. A welder claiming perfection is either very new, not being inspected, or not counting — and the first assumption is usually the second one.

Expert Tip

Give the rate, the volume, and the inspection method, and say what the rejects were. “1.1% on about 600 UT-inspected welds, mostly incomplete fusion on the first run after a procedure change” is a sentence that tells a supervisor you track your own work and understand why it failed.

Continuity Is Checked, So State It

A welding qualification lapses if you do not use the process within the continuity period set by the code. Most welders know this and few state it, which leaves a supervisor to assume the worst about a qualification dated three years ago.

Write “continuity current” or “last used [month]” beside each qualification. If one has lapsed, say so and say when you could re-test. A welder who volunteers a lapsed qualification with a plan reads as organized; one who lists it as though current reads as careless once it is checked, and it is always checked.

Most Welding Jobs Are Won on a Test, Not an Interview

This is the structural fact about welding hiring that shapes how the resume should be written. In most shops the resume gets you to a booth, and the booth decides. That changes the document’s job: it is not trying to persuade, it is trying to get you tested on the right coupon.

Which means the qualification block has to tell a supervisor exactly which test to set you. A welder whose paperwork says “6G, GTAW root with SMAW fill, carbon and 304L, 2 to 8 in” will be tested on something close to that. One whose paperwork says “experienced in multiple processes” gets tested on whatever the shop runs most, which may be nothing like their best work.

Say plainly that you are ready to test, and say what on. “Available to test on 6G carbon or stainless with a day’s notice” closes the loop and removes a scheduling conversation that otherwise takes a week. Our resume format guide covers how to structure a document where the credentials rather than the chronology carry the argument.

Mistakes That Cost Welders Interviews

Check your draft against these

  • “Certified in MIG, TIG and stick.” Replace with code, process, position, material and thickness.
  • No reject rate. It is the comparison figure in the trade.
  • No volume. A 1% reject rate on 40 welds and on 4,000 are different claims.
  • Continuity unaddressed. State it beside each qualification.
  • Only the abbreviation or only the full name. Use both so keyword screens catch you.
  • Fit-up skipped. Most shop rework starts at fit-up; saying you check it is a real differentiator.
  • Travel and rig situation unstated. For pipeline and turnaround work it is a hiring condition.
  • Safety as an adjective. Hot work permits, confined space, and a stop-work decision say more.

Format, Length and the Practical Questions

One page for most welders, with the qualification block taking a third of it. Two pages only for an inspector or supervisor whose project list is the argument. Reverse-chronological below the qualifications — our ATS-friendly resume templates suit large fabricators and EPC contractors, and a professional template works for a direct application to a shop.

Answer the practical questions: rig truck and machine, travel willingness, per diem work, shutdown availability, and whether you can test on arrival. Many welding jobs are filled on a test rather than an interview, and saying you are ready to take one moves things along.

Applying outside the US changes the document — see the welder CV examples for ISO 9606 and coded welding. Pair the application with the welder cover letter examples, and the skilled trades resume examples hub covers the neighbouring trades.

Ready to write your Welder resume?

Turn what you just read into a resume that gets you shortlisted for Welder roles.

Create Resume

Welder Resume FAQ

How much detail do my qualifications need?

All of it: code, process, position, base material, thickness or diameter range, and date. A supervisor reads that block as a description of what you can legally be put on, and a vague version just means they ask for the papers before interviewing you.

What if my reject rate is high?

Give it with context and what changed. A rate that fell from 4% to 1.5% after you addressed a specific defect type is a better story than an unexplained low number, and it is one a supervisor can verify by asking two questions.

Should I list welds I cannot currently qualify for?

Only as experience, clearly separated from current qualifications. “Have welded duplex on previous projects; not currently qualified” is honest and useful. Implying a current qualification you do not hold ends at the test.

Does welding school count as experience?

Arc hours and test plates count as evidence of capability, not as production experience. Give both separately — a graduate with 900 arc hours and four passed plates is a known quantity in a way that a vague claim is not.

Is a CWI worth getting while still welding?

It is the clearest route from the torch to a supervisory or QC seat, and hands-on welding history is what makes an inspector credible on a shop floor. Many welders hold it for years before moving across.

How do I present robotic cell experience?

Separate operating from programming, and give uptime and scrap figures. Also keep your manual qualifications current and say so — a robotic operator who can still pass a 6G test is considerably more employable.

One page or two?

One for almost everybody. The qualification block plus three jobs with figures fits, and anything longer usually means the qualifications were written vaguely.

Close enough to borrow from: HVAC Technician, Carpenter and Automotive Technician.

4.8 (42 ratings)
Portrait of Artur Lopato
Written by
Artur Lopato

Artur Lopato is a product designer and the founder of Wensa, with nearly a decade of experience designing digital products for startups. He leads product and design at Wensa, focused on making resume writing simple, clear, and effective for job seekers everywhere.